Tuesday, May 23, 2006


As you can see we are hard at work putting our thoughts on paper for the building design. Pictured are: Mike Wagner (He's the good looking one), Gary Laughlin (Our civil engineer), and Tracey Powel (Architectural designer).
Keep your comments regarding the building coming! We would like as much input from our members as possible as we move through this process!

Monday, May 08, 2006




This is an initial drawing of a building that would fit on our site. It represents a first stab at what could work on the site and may or may not be the final shape and size. That being said, here are some details about what you are looking at:

Total square footage (first floor) = 26,000
Approximate total square footage (first and second floors) = 42,000
Total parking spaces = 186
Approximate width = 112 feet
Approximate length = 226 feet
Scale is 1”= 60’